PT CG Power Systems Indonesia

CORPORATE STRUCTURE

The Company was established in 1993 as a 50:50 joint venture between Pauwels International NV (PINV) and PT. Arya Sada Perkasa, operating under the name of PT. PASTI. In year 1997, PT. Meta Epsi became new share holder with 40% share holding and a new joint venture emerged as PT. Pauwels Trafo Asia. In 2005, the Pauwels Group as a whole, including this facility, became a part of CG worldwide family. In 2008, PT. Meta Epsi diluted its shareholding and CG Group acquired 100% voting rights of P.T. Pauwels Trafo Asia.

Effective on 15 October 2009, PT. Pauwels Trafo Asia changed its name to PT CG Power Systems Indonesia.

The Business of PT CG Power Systems Indonesia forms an integral part of the Power Systems Strategic Business Unit of CG.

 

BUSINESSES

The Company manufactures Power Transformers and Auto Transformers and forms an integral part of the Power Systems Strategic Business Unit of CG. The factory is located on a land area of 35,000 m2 in an industrial complex located in Cileungsi, approximately 30 km south of Jakarta towards Bogor. The Company has branches in New Zealand and Australia.

 

CAPABILITIES

The factory has an annual capacity of 6,000 MVA, per annum. It produces Power Transformers upto 250MVA and 275kV. PLN is a major local customer and around 80% of the Company's production is exported to Australasia, SE Asia and Middle East Asia countries.

Till date, approximately 1500 units of power transformers have been delivered across 5 continents, facilitating supply of electricity to more than 72 million people.

The Company's Transformers have following industrial and residential applications : mines, wind farms, aluminum smelters, oil and gas applications, steel mills, geothermal substation, severe seismic and coastal areas and residential complexes (low noise transformers).

The Company is self-contained with in-house design, procurement, manufacturing and testing capabilities. The Company also provides full after sales service for the erection and commissioning of Power Transformers. After sales services remain throughout the warranty period and service life of its manufactured products.

PT CG Power Systems Indonesia employs staff and workers with Tertiary and technical qualifications in electrical and mechanical engineering disciplines. Key staff and workers have had significant periods of training at CG's Belgium factories, with periodic updating both in Belgium and CG Power Systems Indonesia, via worker exchange.

The Company operates proven design programs to individually design products to customer specifications and satisfaction.

 

CERTIFICATIONS

The Company has experience working to ANSI & IEC standards as well as other derivatives, such as Australian (AS) and New Zealand (NZS) standards.

PT CG Power Systems Indonesia sources materials, components and accessories from suppliers conforming to the CG worldwide quality standards. This ensures the quality of a PT CG Power Systems Indonesia product.

The company operates under international quality standards and also has ISO 14001 and OHSAS 18001 certifications for Environment and Health, Safety.

 

LOCATION

PT CG Power Systems Indonesia
Kawasan Industri Menara Permai Kav. 10
Jl. Raya Narogong, Cileungsi,
Bogor 16820, INDONESIA

Tel : +62 21 823 04 30 / 36
Fax : +62 21 823 02 68 / 42 / 22  

 

CG Power Systems Indonesia

Australia Sales Office
Unit 9/33 Holbeche Road,
Arndell Park, NSW, 2148
AUSTRALIA

T : + 61 (0)2 9621 3087

For Power Systems
Shyam Khandelwal
M : + 61 (0)481 458 133
shyam.khandelwal@cgglobal.com

For Industrial Systems
David Jamieson
M : + 61 (0)481 454 406
david.jamieson@cgglobal.com

 

New Zealand Branch
NZ Representative Office
31 Stevens Street, Waltham
Christchurch 8011,
NEW ZEALAND

Tel : +64 3 377 82 90
Fax : +64 3 377 82 72

For more detailed product information and sales enquiry click here .